Huizhou, Guangdong, China
Table of Contents
- Company Brief
- Major Partners & Affiliations 🤝
- Company Pulse & Announcements 📢
- Technical & Safety Profile
- Accreditation & Certifications
- Accreditation & Certification Details
- Industry Classification & Specializations
- Contact Information
- Direct Booking & Messaging
- Registered Office Address
- Corporate Identity & Network
- Corporate Evolution & Milestones
- Social Media Presence
Company Brief
Olink New Energy Technology is a leading high-tech manufacturer specializing in the “PV-BESS-EVSE” ecosystem, with a global reputation for high-performance EV charging interfaces and power distribution systems. The firm integrates advanced material science with electrical engineering to deliver automotive-grade charging adapters, solar-integrated storage solutions, and smart AC/DC charging stations.
Major Partners & Affiliations 🤝
National Grid (China), Tesla (via NACS/CCS adapter supply chain), various European Tier-1 EVSE distributors, and regional industrial park developers.
Company Pulse & Announcements 📢
n early 2026, Olink launched its next-generation liquid-cooled 400kW DC fast-charging connector and expanded its “Gandiv Series” solar storage units to the Middle Eastern and Southeast Asian markets.
Technical & Safety Profile
Maintains 8+ automated production lines with an annual output exceeding 150,000 units of EVSE connectors and storage modules.
Support Infrastructure:24/7 technical monitoring for commercial charging networks; global O&M network via certified service providers in Europe and North America.
Technical Compliance & Standards:Adheres to IATF 16949 (Automotive Quality), ISO 9001, CE, TUV, and UL 2251 (for EV plugs and receptacles).
Safety Rating / Record:Zero-LTI (Lost Time Injury) status for 2024-2025; internal safety protocols aligned with ISO 45001.
Warranty & Guarantee Terms:Standard 24-month warranty on EV charging hardware; 5 to 10-year performance warranty on Energy Storage System (ESS) battery cells.
Quality Control Process:Multi-layer vetting including X-ray weld inspection for high-current connectors and 100% EL (Electroluminescence) testing for integrated solar components.
Insurance Details:Product Liability Insurance and Professional Indemnity for global exports.
R&D Focus & Innovation:igh-power liquid-cooled charging technology; V2G (Vehicle-to-Grid) bidirectional power conversion; and ultra-low resistance cable metallurgy.
Accreditation & Certifications
Accreditation & Certification Details
| Certification Name | Authority / Issuing Body | Status / Reference ID | Purpose |
|---|---|---|---|
| IATF 16949 | IATF | Active | Automotive-grade Quality Management System |
| CE (CCS2) | TUV Rheinland | Verified | Safety and EMC compliance for the European market |
| UL 2251 | Underwriters Laboratories | E516181 | Safety standard for EV plugs and connectors |
| ISO 14001 | BSI / CQC | Active | Environmental Management System compliance |
Industry Classification & Specializations
BUSINESS ROLE & ENTITY TYPE:
MARKET SECTORS (B2B/B2C):
EQUIPMENT & HARDWARE:
RENEWABLE ENERGY SERVICES:
AREAS SERVED:
ADDITIONAL COVERAGE NOTES:
Global export capability with dedicated logistics and technical support centers in the Asia-Pacific, North American, and European regions.
AUTHORIZED BRANDS:
Contact Information
Secondary Phone: +86-15976168503 (Global Channel Sales)
Official Email: Inquire via Email ✉️
Website: Visit Company Website ↗️
Direct Booking & Messaging
Registered Office Address
Manufacturing / R&D Lab. (A high-security facility dedicated to the production of high-voltage electrical components and new energy hardware).
Apartment/Suite: No. 01, 7th Floor, Building 28 (and Building 27),
Street address: Zhongnan Hi-Tech Electronic Information Park, No. 27 Licheng Industrial Avenue
City/Locality: Huizhou
State/Province: Guangdong
Postal Code: 516057
Country: China
Geo-Coordinates: 23.0833, 114.4167
Corporate Identity & Network
Olink Industrial Development Co., Limited.
Corporate Headquarter Location:Building 28, Zhongnan Hi-Tech Park, Huizhou, GD, China.
Other Office Locations:Noida, India; Tokyo, Japan
Corporate Evolution & Milestones
Rooted in over a decade of high-precision electrical assembly, Olink transitioned into a global energy leader by pioneering high-current EV charging interfaces.
2016: Formal incorporation of the New Energy division in Huizhou.
2019: Attained IATF 16949 certification, solidifying its role in the automotive supply chain.
2022: Reached 100,000 unit manufacturing milestone for DC charging adapters.
2025: Expanded “Smart Grid” integration services, launching AI-driven energy management for commercial PV-Storage sites.
Social Media Presence
Facebook Page: Follow on Facebook 👍
YouTube Channel: Watch Technical Videos on YouTube ▶️
Data Accuracy Note: While we curate this information from official records, all listing details — including addresses, phone numbers, and products/service terms — are subject to change without notice. We strongly recommend verifying all information directly with the provider (company) before planning a visit or booking services/products. The inclusion of a business in this directory does not constitute an endorsement, guarantee, or recommendation by renewableenergydirectory.net; users are advised to perform their own independent due diligence before entering into any financial or contractual agreements.